Bagni di Lucca (LU)

Bagni di Lucca (LU)

Micropiles to new hydraulic sections.

Drilling’s work, carried out by means of the small drill rig Marini with which it’s possible work in small spaces and in difficult places to reach, to realized micropiles to create a foundation of new hydraulic sections along the course of the Rio Sonagliora in the town of Bagni di Lucca (LU). Photos shows some of the processing steps during drilling and in the jet of cement. Naturally to be able operate with these small vehicles it’s necessary that the hole is self-support after the step of drilling and the drilling diameter is not excessively wide.e.

Comments are closed.