Vicchio (FI)

Vicchio (FI)

Villore’s street consolidation.

To consolidating the access road of Villore in Town of Vicchio (Florence) the our company was awarded the tendering procedure. The work consisted of the realization of micropiles ø 220 mm. with metal reinforcements ø 139.7 mm. thickness 10 mm. with a total length of 12 ml., tie rods of 15 ml., the construction of the reinforced concrete, the assembly of new mixed wooden-steel barrier, and various works accompanying the work. The photos show some phases of the work performed.

Comments are closed.